Granite sub-base, shingle and permeable aggregates
Epsom Cemetery extension and gateway
Completed in 2021, the pathway, entrance and extension at Epsom Cemetery once again saw MCM working with idverde on the hard landscaping preparation. Works included site visits and ground assessments before arranging muck away prior to supply.
Type 1 and Type 3 Aggregates
Volumes of Type 1 and Type 3 granite were delivered by MCM throughout the project. 4/20mm permeable aggregates and 20mm shingle deliveries were managed on site as scheduled, allowing the contractor to prepare pathways, seating areas and the approach to the Cemetery via the walled and gated entrance.
Return to site
We revisited the site in April 2024 to see the completed works.